BS 1377 : Part 4 : 1990
California Bearing Ratio Test
Location             Job ref.      
              Borehole/Pit no.    
Soil description           Sample No.    
              Depth     m
Test method  BS1377: Part 4:  1990: 7.4*     Date      
Force measuring device no.       Unsoaked/soaked*      
            Mean calibration     N/div
                     
Penetration Force gauge Force on Penetration Force gauge Force on
of plunger reading     div plunger   kN of plunger reding      div plunger    kN
0.00mm         4.00        
0.25         4.25        
0.50         4.50        
0.75         4.75        
1.00         5.00        
1.25         5.25        
1.50         5.50        
1.75         5.75        
2.00         6.00        
2.25         6.25        
2.50         6.50        
2.75         6.75        
3.00         7.00        
3.25         7.25        
3.50         7.50        
3.75         7.75        
*Delete as appropriate                  
Moisture content after test  
                     
Container No.                  
Mass of wet soil+container (m2)       g        
Mass of dry soil+container (m3)       g        
Mass of container (m1)       g        
Mass of moisture (m2-m1)       g        
Mass of dry soil (m3-m1)       g        
Moisture content  w=((m1-m3)/(m3-m1))x100   %        
Average moisture content       %        
CBR value at penetration of:        
  2.5 mm   5.0  mm  
Top %   %     Operator Checked Approved
Bottom                
Accepted CBR       %            
         
Form 4F